Project Details
- Date
April - July 2019
- Location
Manurewa, Auckland
- Customer
Buildtech
- Categories:
Project Description
Almost three months later and our work at the new Wordsworth Road housing development has been completed.
This project consisted of the following:
- ground preparation for our own work and other contractors
- demolition of existing fences
- 380+ metres of timber batten and board fence, a mixture of single and double sided
- 245+ metres of retaining board walls
- 145+ metres of Boundaryline DuraPanel Delta aluminium fencing with matching gates
- 32 seismic posts to support the tanks
Great work from all the crew involved!